AI data centers in India
Series 2 · AI campus census · India · records to 16 Oct 2026
India's AI build-out is mostly still on paper and in concrete: most of the published capacity below belongs to campuses that are announced or under construction. This page lists every Indian campus in our census, project by project, with the megawatts each source publishes.
Key facts
- As of 16 Oct 2026, Compute Census counts 51 AI data center campuses in India, 40 of them with a published capacity totalling 6.4 GW.
- 26 of these campuses are under construction (2.1 GW published) and 7 announced (3.7 GW), against 18 operational (573 MW), records to 16 Oct 2026.
- The largest campus with a published figure is Colt DCS / RMZ Visakhapatnam Digital Campus (Colt Data Centre Services / RMZ) at 1,250 MW, announced (records to 16 Oct 2026).
- These campuses are 8.0% of the census by count and 7.2% of its published capacity (records to 16 Oct 2026).
Figure 1Published capacity by capacity class, MW — India
A pipeline, not yet a fleet
Our census counts 51 AI data center campuses in India, and 40 of them publish a capacity. Together those figures add up to 6.4 GW, which is 7.2% of everything the census counts worldwide. The headline hides the timing. Operational campuses account for only 573 MW; the rest is 2.1 GW under construction and 3.7 GW announced.
That split matches what industry research describes. Wood Mackenzie, in research reported in July 2026, put AI-dedicated data center capacity in India at 275 MW in 2025 and expects it to reach 6,546 MW by 2030, against total operational capacity rising from 2.2 GW to 12 GW over the same years. Our figures are not an estimate of that market: they are the sum of named projects whose own sources publish a number, so they undercount wherever a developer has not disclosed megawatts, and they count announced projects that may never be built.
Table 1AI campuses in India by status
| Status | Campuses | With MW | Published MW | Share of MW |
|---|---|---|---|---|
| Under construction | 26 | 21 | 2,126 | 33.0% |
| Announced | 7 | 6 | 3,736 | 58.1% |
| Operational | 18 | 13 | 573 | 8.9% |
Compute Census AI campus census, records to 16 Oct 2026. MW summed only where a source publishes a figure.
Three gigawatt announcements carry the total
The census holds 3 Indian campuses rated at a gigawatt or more, and none of them is running yet. The largest is Colt DCS / RMZ Visakhapatnam Digital Campus, a project of Colt Data Centre Services / RMZ in Visakhapatnam (Vizag) rated at 1,250 MW. AdaniConneX’s Navi Mumbai campus and the HyperVault Future City campus in Hyderabad, backed by TCS, complete the group.
Projects of that size are statements of intent. Each depends on transmission lines, substations and, for liquid-cooled AI halls, water and cooling plant that take years to deliver. A buyer planning GPU capacity in India for the next twelve months should look past the top of Table 2: the operational and nearly finished mid-sized campuses further down the list are where capacity can actually be contracted today.
Table 2Largest AI campuses in India by published capacity
| # | Campus | Operator / developer | MW | Status |
|---|---|---|---|---|
| 1 | Colt DCS / RMZ Visakhapatnam Digital CampusVisakhapatnam (Vizag) | Colt Data Centre Services / RMZ | 1,250 | announced |
| 2 | AdaniConneX Navi MumbaiNavi Mumbai | AdaniConneX | 1,000 | announced |
| 3 | HyperVault Future City CampusHyderabad (Telangana Future City) | HyperVault (TCS) | 1,000 | announced |
| 4 | AdaniConneX HyderabadHyderabad | AdaniConneX | 600 | construction |
| 5 | AdaniConneX PunePune | AdaniConneX | 250 | announced |
| 6 | AirTrunk HYD1Hyderabad | AirTrunk | 243 | construction |
| 7 | Meta-Reliance AI Data Center JamnagarJamnagar, Gujarat | Reliance Industries (built-to-suit for Meta) | 168 | construction |
| 8 | AdaniConneX NoidaNoida | AdaniConneX | 150 | construction |
| 9 | PDG MU1 Navi MumbaiNavi Mumbai (Airoli) | Princeton Digital Group | 150 | operational |
| 10 | Yotta Chennai Data Center ParkChennai | Yotta Data Services | 140 | announced |
| 11 | AirTrunk MAA1Chennai | AirTrunk | 128 | construction |
| 12 | PDG MU2 Navi MumbaiNavi Mumbai | Princeton Digital Group | 120 | construction |
Compute Census AI campus census, records to 16 Oct 2026. MW summed only where a source publishes a figure.
Developers rather than hyperscalers
India’s list is led by developers that lease space and power to tenants, not by the cloud companies themselves. AdaniConneX leads with 4 campuses and 2.0 GW of published capacity. Princeton Digital Group, AirTrunk, ST Telemedia, CtrlS and Yotta follow, each with several campuses. In all, 25 named operators or developers appear.
The hyperscalers are present, but mostly without a published figure. Microsoft’s Hyderabad region and AWS’s campus in Bharat Future City are in the census with no megawatts in their sources, and Google’s AI hub in Visakhapatnam is listed as announced, also without a number. Meta’s capacity appears through a built-to-suit campus that Reliance Industries is building in Jamnagar. For anyone counting India’s AI capacity, those gaps matter: the largest buyers of GPUs are the least likely to publish what they are building.
Table 3Operators and developers of AI campuses in India, by published MW
| Operator / developer | Campuses | Published MW |
|---|---|---|
| AdaniConneX | 4 | 2,000 |
| Colt Data Centre Services / RMZ | 1 | 1,250 |
| HyperVault (TCS) | 1 | 1,000 |
| Princeton Digital Group | 4 | 432 |
| AirTrunk | 2 | 371 |
| ST Telemedia Global Data Centres (India) | 6 | 207 |
| CtrlS Datacenters | 3 | 175 |
| Yotta Data Services | 4 | 170 |
| Reliance Industries (built-to-suit for Meta) | 1 | 168 |
| Iron Mountain | 4 | 133 |
Compute Census AI campus census, records to 16 Oct 2026. MW summed only where a source publishes a figure; top 10 shown.
Hyderabad, Navi Mumbai and Chennai
Three metros hold most of the capacity. Hyderabad leads with 7 campuses and 1.9 GW, driven by two very large announcements and a cluster of builds by AdaniConneX, AirTrunk and Princeton Digital Group. Navi Mumbai and Mumbai together form the densest cluster by count. Chennai has the most campuses of any single city in the list, most of them mid-sized builds by colocation developers.
The newer names point to where growth is going next. Visakhapatnam appears through two large projects, and Raipur and Indore through RackBank’s liquid-cooled builds. Both sit outside the established hubs, which is where the next round of capacity is being announced. Across the country, 16 campuses record liquid cooling, the clearest sign that a site is being built for dense GPU racks rather than for conventional enterprise servers.
Table 4AI campuses in India by city, by published MW
| City or district | Campuses | Published MW |
|---|---|---|
| Hyderabad | 7 | 1,947 |
| Navi Mumbai | 9 | 1,368 |
| Visakhapatnam | 2 | 1,250 |
| Chennai | 10 | 645 |
| Mumbai | 8 | 360 |
| Pune | 2 | 274 |
| Noida | 4 | 241 |
| Jamnagar | 1 | 168 |
| Vijayawada | 1 | 60 |
| Panchkula | 1 | 50 |
| Sriperumbudur | 1 | 30 |
| Greater Noida | 1 | 30 |
Compute Census AI campus census, records to 16 Oct 2026. MW summed only where a source publishes a figure; top 12 shown.
Reading this list
Three cautions apply. First, “announced” means a developer has said it will build, usually with a capacity and a city; it does not mean land, power and permits are secured. Second, megawatts are as published, and some sources quote IT load while others quote grid connection, so two campuses of the same headline size can differ in usable capacity. Third, 11 Indian campuses publish no capacity at all and add nothing to the totals, so the real figure is higher than the sum above.
For the full picture of data centers in India, including conventional enterprise and colocation facilities that do not meet our AI definition, see the megawattlas.com country page for India. This page counts only campuses that carry an AI-ready flag in their records or are pipeline projects of at least 50 MW.
Every campus in India
Table AAI campuses in India, largest published capacity first
| Campus | Operator / developer | MW | Status | Liquid |
|---|---|---|---|---|
| Colt DCS / RMZ Visakhapatnam Digital CampusVisakhapatnam (Vizag) | Colt Data Centre Services / RMZ | 1,250 | announced | yes |
| AdaniConneX Navi MumbaiNavi Mumbai | AdaniConneX | 1,000 | announced | |
| HyperVault Future City CampusHyderabad (Telangana Future City) | HyperVault (TCS) | 1,000 | announced | yes |
| AdaniConneX HyderabadHyderabad | AdaniConneX | 600 | construction | |
| AdaniConneX PunePune | AdaniConneX | 250 | announced | |
| AirTrunk HYD1Hyderabad | AirTrunk | 243 | construction | |
| Meta-Reliance AI Data Center JamnagarJamnagar, Gujarat | Reliance Industries (built-to-suit for Meta) | 168 | construction | yes |
| AdaniConneX NoidaNoida | AdaniConneX | 150 | construction | |
| PDG MU1 Navi MumbaiNavi Mumbai (Airoli) | Princeton Digital Group | 150 | operational | |
| Yotta Chennai Data Center ParkChennai | Yotta Data Services | 140 | announced | |
| AirTrunk MAA1Chennai | AirTrunk | 128 | construction | |
| PDG MU2 Navi MumbaiNavi Mumbai | Princeton Digital Group | 120 | construction | |
| Colt Chennai Data CentreChennai (Ambattur) | Colt DCS | 96 | announced | |
| CtrlS Mumbai Data Center CampusMumbai | CtrlS Datacenters | 95 | operational | yes |
| PDG HY1 HyderabadHyderabad | Princeton Digital Group | 90 | construction | |
| Iron Mountain MUM-3Mumbai | Iron Mountain | 85 | construction | |
| CtrlS Chennai Data Center ParkChennai | CtrlS Datacenters | 72 | operational | yes |
| PDG CH1 ChennaiChennai | Princeton Digital Group | 72 | construction | |
| STT Palava 4Mumbai (Palava) | ST Telemedia Global Data Centres (India) | 61 | construction | |
| STT Palava 5Mumbai (Palava) | ST Telemedia Global Data Centres (India) | 61 | construction | |
| Pi Amaravati Data CenterVijayawada (Mangalagiri) | Pi Data Centers | 60 | construction | |
| CapitaLand Data Centre Navi Mumbai Tower 2Navi Mumbai | CapitaLand India Trust | 55 | construction | yes |
| NTT Noida 2 Data CenterNoida | NTT Global Data Centers | 53 | construction | |
| Anant Raj Cloud PanchkulaPanchkula | Anant Raj Cloud (Ashok Cloud) | 50 | construction | |
| STT Palava 1Mumbai (Palava) | ST Telemedia Global Data Centres (India) | 50 | construction | |
| Techno Digital ChennaiChennai | Techno Digital (Techno Electric) | 50 | operational | |
| STT GDC India Chennai Siruseri CampusChennai | STT GDC India | 45 | operational | |
| Sify Rabale Data Center Campus (Tower 5)Navi Mumbai | Sify Technologies | 43 | operational | yes |
| L&T-Cloudfiniti SPD1Sriperumbudur | L&T Cloudfiniti (Larsen & Toubro) | 30 | operational | yes |
| Techno Digital NoidaNoida | Techno Digital (Techno Electric) | 30 | construction | |
| Yotta D1Greater Noida | Yotta Data Services | 30 | operational | |
| STT Pune 5Pune (Dighi) | ST Telemedia Global Data Centres (India) | 24 | operational | |
| Iron Mountain CHN-1Chennai | Iron Mountain | 23 | construction | yes |
| Iron Mountain CHN-2Chennai | Iron Mountain | 19 | construction | yes |
| Sify Hyderabad Data CenterHyderabad | Sify Technologies | 14 | operational | yes |
| CtrlS Noida Data CenterNoida | CtrlS Datacenters | 8 | operational | yes |
| Iron Mountain MUM-2Mumbai | Iron Mountain | 6 | operational | |
| STT Jaipur 1Jaipur (Sitapura) | ST Telemedia Global Data Centres (India) | 6 | operational | |
| STT Kolkata 2Kolkata (New Town) | ST Telemedia Global Data Centres (India) | 6 | construction | |
| Pi Data Centers Central MumbaiMumbai | Pi Data Centers | 3 | construction | |
| AWS Bharat Future City Data CenterHyderabad (Bharat Future City) | Amazon Web Services (AWS) | n/p | construction | |
| Digital Edge BOM1Navi Mumbai | Digital Edge | n/p | operational | |
| Equinix CN1Chennai | Equinix | n/p | operational | |
| Equinix MB3Mumbai | Equinix | n/p | operational | yes |
| Google AI Hub VisakhapatnamVisakhapatnam (Vizag) | Google / AdaniConneX / Airtel | n/p | announced | |
| Microsoft Azure India South Central Region — HyderabadHyderabad, Telangana | Microsoft | n/p | operational | |
| RackBank CEN1 (Raipur)Raipur | RackBank | n/p | construction | yes |
| RackBank CEN2 (Indore)Indore | RackBank | n/p | construction | yes |
| RackBank WST1 (Navi Mumbai)Navi Mumbai | RackBank | n/p | construction | yes |
| Yotta NM1Navi Mumbai | Yotta Data Services | n/p | operational | |
| Yotta NM2Navi Mumbai | Yotta Data Services | n/p | construction |
n/p = capacity not published by the source. Liquid = liquid cooling recorded for the site. Full census with every country: AI data center census.
Nothing here matches. Try a shorter search or fewer filters. Clear filters
Sources: the record behind every campus on this page is listed under Sources, India. How campuses enter the census: methodology. Download the census: CSV · JSON.